We installed a new roof, vinyl siding and trim, post light, new porch build including pier build with stone split face limestone steps and composite tapered posts.
Friday, August 8, 2014
Thursday, August 7, 2014
Complete kitchen Remodel
Complete kitchen remodel.
Installed cabinets, counter, sink, new appliances, hand scraped bamboo flooring, lighting, stone slate backsplash, kitchen island and burgandy venetian plaster on the walls as well as a custom handscraped window trim.
Sunday, July 27, 2014
Bathroom remodel
Complete bathroom tearout, plumbing rework, tile, window, cabinet, counter and sink, tub, diverter and lighting installation along with me subfloor and drywall.
Tuesday, July 22, 2014
Brick Driveway Arch repair
Original arch was falling and brick twisting and falling out on right side. We had to build a form to support the arch while removing it. Once the brick were removed we built the other side of arch support and rebuilt the arch and bricked on top.
Half bath Remodel and Shower Addition
Complete half bath tear out. Plumbing moved. Shower installed where toilet was, toilet moved to center of room and diverter plumbing and valves added.
shower and pan installed with tile, floor and baseboards tiled, pocket door installed, new vanity and sink installed.
Friday, July 11, 2014
Addition Footing Poured
The addition footing is poured, now to move the ac, furnace venting,sump pump and stripping brick from garage and house sides before foundation and brick of the addition.