Friday, January 26, 2018

Basement Bathroom

Small basement bathroom addition. The concrete was cut out and removed to run drain lines for the toilet, shower and venting. The cutout was then recemented. Tile and grout installed. We then added a light, switch and receptacle. Toilet, shower and sink were installed. We also installed shelving behind sink and to the right outside of the pictured area.




Sunday, December 10, 2017

Paver Patio and Sidewalk



Saturday, December 9, 2017

fireplace surround

wood mantle with marble hearth and surround

Monday, November 6, 2017

Bathroom Floor and Shower Tile

Shower pan installed, 4x 12 inch subway tiles used for shower, 12x24 tiles for floor and baseboards and marble thresh holds for shower curb and doorway.