Footing and Porch Foundation

42 inch footing and 2 coarse of block porch foundation. A cement cap and steps will be installed later.


Sunday, April 8, 2018

Front Porch Base Build

Backup wall and finishing wall completed.

Tuesday, April 3, 2018

Custom Pantry Build and Closet Remodel

The existing pantry was 6 inches deep. We added a custom built 24 inch deep pantry to reuse the old existing door sizes. The pantry closet next to it had a bifold door which prevented half the access when open. We added a standard door and re-trimed the opening and installed a ball catch for closing.



Monday, April 2, 2018

Porch Rebuild ans Step Replacement

Porch repair and step replacement. We removed the old damaged block and replaced with new block, we themn rmoved a single concrete step and replaced with 2 steps with limestone treads.


Tuesday, March 27, 2018

Chimney Rebuild

tear down and rebuild of chimney with common bricks. We installed a false flue limestone cap and wash.