Tuesday, April 23, 2024

Composite deck resurface and rails

Old decking and rails removed. Joists added for 16 inch on center. New trex coastal bluff composite installed with hidden fasteners and trex bronze signature classic aluminum railings installed.




 

Monday, April 22, 2024

Fireplace Build

Fireplace framed out and stoned. Space for fireplace and swinging tv mount.


 

Saturday, April 20, 2024

Shower Door In


 

Friday, April 19, 2024

Limestone Step Install

We removed old 36 inch precast step and installed a 3 inch by 48 inch limestone stair tread with brick riser.



 

Tuesday, March 5, 2024

Shower remodel

Surround tear out, new large format marble look porcelain 32 inch tiles, niche and fixtures installed.



 

Thursday, February 1, 2024

Bathroom Remodel

Complete bathroom demo. Tub converted to shower, with door and new plumbing. Lvp flooring installed, pvc wainscoting and new vanity mirror and electrical. Pantry style cabinet installed and hallway closet resised to fit pantry.





 

Wednesday, January 31, 2024

Half Bathroom Remodel

Half bathroom remodel. New Lvp flooring, pvc wainscoting, vanity, electrical and medicine cabinet.


 

Wednesday, January 17, 2024

Shower Install

Handicap curbless shower installation. Brick tiles for floor and porcelain for shower.