Monday, July 17, 2017

Bathroom Remodel





Friday, July 14, 2017

Wet room shower install

Bathroom floor shower pan installed, duroc installed on walls and regaurd applied. Waiting for tile.



Wednesday, July 12, 2017

Master Bath Remodel

Master bath remodel.










Tuesday, July 11, 2017

Monday, July 10, 2017

Wednesday, May 10, 2017

Deck Build

Deck build with aluminum spindles and solar light post caps.


Sunday, May 7, 2017

Roof Replacement

Tear off of old one layer roof, New plywood installed on back half of roof, Ice shield, drip edge and synthetic underlayment used. Dimensional shingles used.




Saturday, May 6, 2017

Porch and Rail Installation

Outdoor carpet was removed from the porch top and old handrail was removed.. Trex decking was installed on the porch cap with pvc fascia boards. A new hand rail was also installed.


Wednesday, April 19, 2017

Patio Privacy Fence

Patio privacy fence build. Three small walk through pergolas were built and metal roofing was used as the fence panels. Decorative wood accents were then added.


Tuesday, April 18, 2017

Brick and Concrete Installation

The original driveway was tied into the house with rebar causing the brick wall to tilt out as the driveway sunk near the house. The old brick wall was removed. The concrete driveway was cut and the sunken concrete removed. A new brick wall was built and new concrete poured.


Monday, April 17, 2017

Sunday, April 16, 2017

Pvc Fencing Install

Removal of old wooden fence and installation of new vinyl fencing.


Saturday, April 15, 2017

Backsplash Install

Small kitchen tile backsplash installation.

Thursday, March 30, 2017

Partial kitchen remodel

Painted the kitchen cabinets, installed new counter tops and tiled backsplash. We also installed a new sink, faucet and dishwasher.

Wednesday, March 29, 2017

Finished Laundry Room

Finished the laundry room build by installing a patterned tile floor and butcher block counter top.



Saturday, March 4, 2017

Stone Wall

Stone stairway accent wall installed.