Saturday, December 31, 2016

New Bathroom Build

This was previously a laundry room. New plumbing installed, walls built to center tub under the window. We then installed tub, vanity, toilet, subway tile and stone, bath fan and hardwood flooring. Custom cabinets or shelving units will be installed on either side of the tub.



Thursday, December 8, 2016

Hardwood Floor Install









Tuesday, December 6, 2016

Laundry Room Build

The homes bathroom had a laundry in the bathroom. We created a laundry room in the large family room to separate the laundry from the bath. The ceiling beam was cut, new walls built, plumbing and laundry drain ran, new circuit to separate appliances, new line for ceiling light and switch, gas line and vent installed. We then finished off the interior walls with shiplap and installed a solid barn style door.




Monday, December 5, 2016

Fireplace Remodel

Before and after pictures of the fireplace remodel. We framed out the wall to be even with the brick face, then installed drywall over the entire wall. We moved the ceiling lights to sconces on either side of the fireplace. We built a raised hearth and and mantle. Installed a receptacle in the shelf, above the fireplace and ran hdmi cables through the fireplace. We then tiled with marble tiles in a herringbone pattern.
                                                                            before
                                                                            after

Sunday, December 4, 2016

Farm Sink Install

The old sink was removed and a new farm sink installed. A garbage disposal was also installed with a new circuit and switch. A new faucet was also installed.

Saturday, December 3, 2016

Crawl space Vapor Barrier

The crawl was leveled off and a 12 mil vapor barrier was installed over the floor and walls.


Friday, December 2, 2016

Barn Door Build and Installation

The door frame was built and barnwood stained and attached. The Door hardware was painted flat black and made from garage door rollers and steel bar.


Thursday, December 1, 2016

Crown Molding Install

crown molding installation and paint. 5.25 inch crown.










Wednesday, November 30, 2016

Door Install

The existing home had a door at the bottom of the stairway. We built a wall at the top and installed a door at the top of the steps. We removed the door at the bottom.


Sunday, October 30, 2016

Cown Molding Installation

Installed 5 1/4 inch crown molding and medallion in dining room, foyer, hallway and kitchen.




Saturday, October 29, 2016

Friday, October 28, 2016

Floor Install

Kitchen floor installation. Ceramic wood look 8 x 24 inch tiles used.





Sunday, October 9, 2016

Den Remodel

We converted the front den to a bedroom by adding a wall and door. We then built a closet with side shelving and french doors.