Monday, May 25, 2020

Retaining Wall Edging

Flower bed landscape edging blocks installed 3 layers high.


Friday, May 22, 2020

Beadboard Ceiling

Bathroom remodel finished by installing a pvc beadboard ceiling with 6" pvc trim.



Thursday, May 21, 2020

Block Landscape edging

Base and three layers of edging block installed.

Tuesday, May 12, 2020

Wednesday, April 29, 2020

Kitchen Rough In

Soffet removed, floor raised with new subfloor, walls drywalled and old tied in textured ceiling and walls skimcoated to match new drywall.



Tuesday, April 28, 2020

Pool Deck Build

Pool deck build completed. Need to still add a couple of stair lights. Doorwall install next. Where window is located.



Saturday, March 14, 2020

Porch Railing Install

Old wrought iron railing and posts were removed and new white Peak aluminum railings were installed. Porch step was removed and new step installed and mortar in place.


Sunday, March 1, 2020

Laundry Room floor

Laminate tile floor installed in laundry room. base board removed and reinstalled. New drain installed.