Monday, December 21, 2015

Garage Build and Stone facing

Garage build with cultured stone pier facing to match installation of stone on the house.


Sunday, December 20, 2015

Backsplash install

  1. New drywall was installed then stone backsplash. We also installed the over stove vent hood.




Friday, December 18, 2015

Second Floor Laundry Tile Installation

We installed cement board and tiled this Second floor laundry room

Thursday, December 17, 2015

Master Bath Remodel

Complete tearout down to studs. We installed new cabinets, countertops, sink and fixtures. We also installed new lighting, outlets and drywall. We tiled the floor, shower and tub surround and installed a new toilet and whirlpool tub.



Monday, December 14, 2015

Powder Room Remodel

The old powder room was demoed. We installed a new subfloor, cement board, tile, a new vanity, counter and faucet, toilet and put on two coats of paint.


Tuesday, December 8, 2015

Bar Backsplash

We finished the stone installation for the wet bar backsplash. The wet bar features new cabinets, countertops, a stainless trough sink and recycled pallet wood facing.



Monday, December 7, 2015

Garage Addition Project

Progress of our funeral home garage addition. We now have the concrete pad poured. Framing and sheathing also installed.



Thursday, November 26, 2015

Hardwood Floor Refinish

Living room and hallway floor refinish. The carpet and padding were removed and disposed of. The tack strips and staples were removed. All the holes were filled. The floor was then sanded and three coats of poly were applied for a natural finish.