Sunday, December 21, 2025
Update Before and After Pics
An update to a previous post with the before pictures added.
www.topvalueconstructionllc.com
Bathroom Remodel
Full tearout, besides drywall and complete bathroom remodel.
Saturday, December 13, 2025
Multi Season Room Remod
Rotted wood removed, knee wall built, stairs and platform built, birch shelve tops installed and siding.
Friday, December 12, 2025
Kitchen remodel
New flooring, cabinets, countertop, appliances and backsplash.
Thursday, December 11, 2025
Bathroom remodel
Complete bathroom remodel. Demoed down to the studs. New drywall, converted to shower, new plumbing , electrical moved, new vanity, toilet, paint, door.
Monday, December 1, 2025
Deck Resurface
Trex rope swing decking used on deck resurface. Customer did not want fascia installed.
Newer Posts
Older Posts
Home
Subscribe to:
Comments (Atom)