Friday, September 19, 2025

Deck and Stair repair


 

Thursday, September 18, 2025

Three Decks One House





 

Wednesday, September 17, 2025

Roof Installation

Roof tearoff and new install with atlas shingles.


 

Sunday, August 24, 2025

Bathroom Build

Plumbing and electrical ran. drywall installed, door opening created, barn door installed, bath fan and lights installed, trim installed, tile installed, vanity and toilet installed, shower door installed, fixtures installed and walls primed.






 

Wednesday, July 16, 2025

Roof Installation

Roof tearoff and new roof installation on house, barn with apartment, playhouse and shed. Gaf Hdz shingles used.








 

Monday, June 30, 2025

Sunday, June 29, 2025

Kitchen Remodel

Full kitchen remodel, full tear out, soffit removal, wall removal, new cabinets, flooring, backsplash tile, sink, faucet, quartz countertops, lights, paint, doors, dishwasher addition.





 

Sunday, May 25, 2025

Bathrrom Remodel

Bathroom tore out down to studs. New tub, flooring ,surround, diverter,  drywall, vanity, lights and toilet installed.

 


Saturday, May 24, 2025

Tub and Surround install


 Old tub and surround removed. New tub and surround installed as well as drywall and diverter.