Garage attached to the basement was not being used for anything since there is an 11 car pole barn. The garage was converted into a game room attached to existing walk out basement. Insulation, drywall, paint and copper metallic epoxy flooring.
Monday, August 29, 2022
Sunday, August 28, 2022
Trex Deck Build
Trex composite decking build. Customer wanted deck to be freestanding. Rocky Harbor decking and fascia with transcend white rails with black metal ballusters.
Saturday, August 27, 2022
Small Bathroom Partial Remodel
Bathroom was demoed except for tub and wall tile. New lvp flooring installed, Wall cutout and pvc drain line repaired, broken toilet flange cut out and new flange installed and lowered, new vanity installed , toilet installed and baseboards.