Saturday, June 27, 2015

Bathroom remodel

Complete bathroom tear out and remodel. A new tub was installed, new drywall, new sink, vanity, backsplash, toilet, towel holders, new tile shower surround, window sill and floor.




Friday, June 26, 2015

Backsplash installation

Stone tile back splash installation with copper accents.



Thursday, June 25, 2015

Chimney Rebuild

Chimney was tore down and rebuilt with new wash and stainless steel caps.

Paver patio and sidewalk installation

Brick paver patio and sidewalk installation.

Monday, June 15, 2015

Marble tile project 3

marble tile master bath installation. Bathroom 3 on three bath and laundry room tile project. Curbless shower system with entire room pan installed. Marble octagon tiles installed on the floor, marble threshold and shower bench top, base molding, full tiles used on the walls, subway tiles, pencil and chair rail tiles used. A cubby was installed in the shower with a glass shelve insert.





Sunday, June 14, 2015

Marble tile Project 2.

Main bathroom tile install on three bath and laundry room home. Curbless shower with whole floor shower pan. Octagon marble mosaic tile on the floor, marble threshold and shower bench top, full size tile walls, pencil and chair rail tile along with a wall cubby in shower.




Saturday, June 13, 2015

Marble tile project 1.

First project on a three bathroom and laundry room marble tile job. We installed marble tile floors and baseboards in the laundry room. We then installed marble in the half bath. Full size tiles on the floor with marble baseboards, subway tile, pencil tile, mosaic tile and marble chair rail.




Brick paver patio and sidewalk

15 foot by 10 foot brick patio and sidewalk installation.

Friday, June 12, 2015

Porch build and sidewalk

porch rebuild project. Brick porch with new cap limestone steps new concrete walkway with clay brick pavers as a border. new limestone rear steps.



Friday, June 5, 2015

Room Remodel and Paint

The bedroom was gutted down to the studs, new drywall was hung. The room was primed and painted. New baseboards, shoe molding, window casings and sill, door casings were stained to match the existing house trim and installed. The kitchen light was moved to center it in the kitchen and the room was painted.



Thursday, June 4, 2015

Deck and Stain job




Exterior Paint job

We powerwashed and scraped the old paint. The House and garage trim and all the windows were painted as well as the garage door.



Garage Brick Repair and Replacement

Original brick had been caulked and bricks were damaged. We replaced the damaged bricks and mortared.