Sunday, July 27, 2014

Bathroom remodel

Complete bathroom tearout, plumbing rework, tile, window, cabinet, counter and sink, tub, diverter and lighting installation along with me subfloor and drywall.

Tuesday, July 22, 2014

Brick Driveway Arch repair

Original arch was falling and brick twisting and falling out on right side. We had to build a form to support the arch while removing it. Once the brick were removed we built the other side of arch support and rebuilt the arch and bricked on top.





Half bath Remodel and Shower Addition

Complete half bath tear out. Plumbing moved. Shower installed where toilet was, toilet moved to center of room and diverter plumbing and valves added. shower and pan installed with tile, floor and baseboards tiled, pocket door installed, new vanity and sink installed.






Brick wall patch

Flower box removed and bricks reused to fill in garage wall behind box.

Friday, July 11, 2014

Addition Footing Poured

The addition footing is poured, now to move the ac, furnace venting,sump pump and stripping brick from garage and house sides before foundation and brick of the addition.

Porch Finally Done

Old railings and steps installed to complete porch build.

Saturday, July 5, 2014

Brick porch and flower box

Footing and 3 coarse brick porch build and repair of the right side of the flower box brick and limestone caps.

Stone Flower box stone repair

Repair on stone that was broken when old porch was tore out. Looks like whoever did the porch also pulled up the footing on the front wall.

Commercial block work

Removal of bay door and blocked closed with 12 inch block. Cutting out 10 windows and a doorway in the block also. The 2 sides of the blockup have been left open to cut out windows.