Exterior paint in Canton completed. Power wash and caulked entire exterior. Painted front door, garage door, trim, soffits, fascia, posts, gutters and downspouts
Thursday, August 27, 2015
Tuesday, August 25, 2015
Chimney rebuild and cap replacement
Top four coarses of chimney were rebuilt and a new cap and wash. We also tuck pointed bad spots on the entire length of the chimney.
Monday, August 24, 2015
Bathroom Remodel Project Progress
Bathroom remodel almost completed. We installed a new whirlpool tub, new plumbing, subway tile shower surround, with red guard water barrier under tile, new shower fixtures, new drywall, new shower door, heated floor system, tiled floor and baseboards, new insulation, bath fan install(with light, nightlight mode and blu tooth speakers). All thats left is the counter, sink, backsplash and paint.
Thursday, August 20, 2015
Finished Wall
Previous project now finished. We installed the electrical and led lighting on the brick piers. Glass block was installed on top of the caps along with beveled limestone caps to top it off. The top caps are laid in place by weight only, so they can be easily removed for electrical and bulb maintenance.
Sunday, August 9, 2015
Privacy and Dividing Wall
Brick and limestone dividing wall and privacy fence build. Glass block with led lighting will go on caps with another top cap on piers.
Saturday, August 8, 2015
Friday, August 7, 2015