Thursday, August 27, 2015

Canton Exterior Paint Job

Exterior paint in Canton completed. Power wash and caulked entire exterior. Painted front door, garage door, trim, soffits, fascia, posts, gutters and downspouts











Tuesday, August 25, 2015

Chimney rebuild and cap replacement

Top four coarses of chimney were rebuilt and a new cap and wash. We also tuck pointed bad spots on the entire length of the chimney.


Monday, August 24, 2015

Farmhouse Glass Block Window Installation

Old aluminum and glass windows removed and we installed new glass block windows in the basement.





Bathroom Remodel Project Progress

Bathroom remodel almost completed. We installed a new whirlpool tub, new plumbing, subway tile shower surround, with red guard water barrier under tile, new shower fixtures, new drywall, new shower door, heated floor system, tiled floor and baseboards, new insulation, bath fan install(with light, nightlight mode and blu tooth speakers). All thats left is the counter, sink, backsplash and paint.




Thursday, August 20, 2015

Finished Wall

Previous project now finished. We installed the electrical and led lighting on the brick piers. Glass block was installed on top of the caps along with beveled limestone caps to top it off. The top caps are laid in place by weight only, so they can be easily removed for electrical and bulb maintenance.


Sunday, August 9, 2015

Privacy and Dividing Wall

Brick and limestone dividing wall and privacy fence build. Glass block with led lighting will go on caps with another top cap on piers.






Saturday, August 8, 2015

Porch and sidewalk build

Brick porch build with limestone accent corners with exposed aggregate cap, steps and sidewalk.


Friday, August 7, 2015

Exterior Poolside Bathroom

Marble bathroom with exterior poolside entrance, nonskid floor tiles and stone shower floor.