Monday, August 24, 2015

Bathroom Remodel Project Progress

Bathroom remodel almost completed. We installed a new whirlpool tub, new plumbing, subway tile shower surround, with red guard water barrier under tile, new shower fixtures, new drywall, new shower door, heated floor system, tiled floor and baseboards, new insulation, bath fan install(with light, nightlight mode and blu tooth speakers). All thats left is the counter, sink, backsplash and paint.




No comments:

Post a Comment