Saturday, August 27, 2022
Small Bathroom Partial Remodel
Bathroom was demoed except for tub and wall tile. New lvp flooring installed, Wall cutout and pvc drain line repaired, broken toilet flange cut out and new flange installed and lowered, new vanity installed , toilet installed and baseboards.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment