Old cheapdamaged laminate flooring removed and new hardwood installed with vapor barrier.
Monday, December 26, 2022
Friday, December 23, 2022
Thursday, December 22, 2022
Partial Garage Remodel
Concrete platforms and step added. Old kitchen cabinets installed in garage on platform with countertops.
Wednesday, December 21, 2022
Kitchen Remodel and flooring install
Carpet and improperly installed hardwood removed, old backsplash removed, drywall repair. New lvp flooring installed and backsplash.
Tuesday, December 20, 2022
Monday, December 19, 2022
Friday, October 14, 2022
Thursday, October 13, 2022
Tuesday, October 11, 2022
Log Home Stain
Logs washed with tsp and rinsed, hand scrubbed. Three coats of pecan Ready Seal Stain hand rubbed and 2 extra coats sprayed.
Monday, October 10, 2022
Monday, August 29, 2022
Log Home Rehab Garage Remodel
Garage attached to the basement was not being used for anything since there is an 11 car pole barn. The garage was converted into a game room attached to existing walk out basement. Insulation, drywall, paint and copper metallic epoxy flooring.
Sunday, August 28, 2022
Trex Deck Build
Trex composite decking build. Customer wanted deck to be freestanding. Rocky Harbor decking and fascia with transcend white rails with black metal ballusters.
Saturday, August 27, 2022
Small Bathroom Partial Remodel
Bathroom was demoed except for tub and wall tile. New lvp flooring installed, Wall cutout and pvc drain line repaired, broken toilet flange cut out and new flange installed and lowered, new vanity installed , toilet installed and baseboards.
Friday, July 29, 2022
Subscribe to:
Posts (Atom)