Saturday, September 19, 2015

Bathroom remodel

Bathroom remodel done and ready for the customer to paint. We removed old tub, surround, floor, vanity, toilet, medicine cabinet and plumbing. We then installed a new tub and diverter. We patched the hole from the removed medicine cabinet and repaired drywall on wall corners. We installed new cement board with redgaurd waterproofing. We tiled the shower surround and floor. Installed a new threshold, toilet and vanity. All that is left is for the customer to paint.




No comments:

Post a Comment