We installed stacked cultured stone on foyer wall with backing and vapor barrier.
Wednesday, September 30, 2015
Tuesday, September 29, 2015
Commercial Block Work
Commercial block work. We removed several walls, cut new door openings, blocked in old door openings and installed block and iron lintels on new openings.
Tuesday, September 22, 2015
Fireplace Build
The old fireplace surround and mantle were removed. We increased the fireplace face and mantle size. A slate hearth was installed with trim, stone fireplace face installed and a custom built mantle.
Sunday, September 20, 2015
Great Room Paint Completed
Great room ceiling and foyer ceiling painted. We then painted great room, foyer, stairs and hallway walls and trim.
Saturday, September 19, 2015
Bathroom remodel
Bathroom remodel done and ready for the customer to paint. We removed old tub, surround, floor, vanity, toilet, medicine cabinet and plumbing. We then installed a new tub and diverter. We patched the hole from the removed medicine cabinet and repaired drywall on wall corners. We installed new cement board with redgaurd waterproofing. We tiled the shower surround and floor. Installed a new threshold, toilet and vanity. All that is left is for the customer to paint.
Friday, September 18, 2015
Thursday, September 17, 2015
Porch reface
The old bricks were taken out on the porch face and we installed new matching bricks to face the front of the porch.
Monday, September 7, 2015
Finish bathroom remodel
A few last items completed for bathroom remodel. Granite vanity counter installed with tile backsplash. Door frame shimmed out a quarter inch because of a past improperly installed door frame and laundry shoot trim installed.
Sunday, September 6, 2015
Kitchen Floor Tile job Completed
Floor tile completed. Old linoleum floor and subfloor was removed, cement board installed. The floor was then leveled by the stairs as it had a 2 inch dip in the floor. Tile and grout was then installed.