This bathroom floor had a 2 inch pitch from the outside wall to the inside wall. We had to remove all thhe fixtures and the old floor and subfloor. The toilet flange had to be raised 2 inches. We then leveled the floor and installed a new 3/4 floor, then installed a 1/4 subfloor. We finished it off with duraceramic tile and grout.
No comments:
Post a Comment