Strip mall construction almost done. Will go back down to finish interior in winter.
Friday, June 29, 2012
Thursday, June 28, 2012
Whole Lot of stuff
Wednesday, June 27, 2012
FAMILY ROOM REMOD
Tuesday, June 26, 2012
BATHROOM FLOOR
This bathroom floor had a 2 inch pitch from the outside wall to the inside wall. We had to remove all thhe fixtures and the old floor and subfloor. The toilet flange had to be raised 2 inches. We then leveled the floor and installed a new 3/4 floor, then installed a 1/4 subfloor. We finished it off with duraceramic tile and grout.
Monday, June 25, 2012
Sunday, June 24, 2012
Saturday, June 23, 2012
Friday, June 22, 2012
Thursday, June 21, 2012
Wednesday, June 20, 2012
Subscribe to:
Posts (Atom)