Kitchen remodel tile installation with 12x12 and 6x6 pattern.
Tuesday, August 4, 2020
Monday, August 3, 2020
Sunday, August 2, 2020
Saturday, August 1, 2020
Fireplace Build
Fireplace framed out and board hung. Drywall installed on sides, Mantle installed, We then installed a stone face and tile trim around the opening and light electrical boxes.
Friday, July 31, 2020
Thursday, July 16, 2020
Bathroom Remodel
Small bathroom repair and remodel. The old toilet and vanity were removed. The flooring was removed as well as 3 layers of water damaged subfloor. We installed a new subfloor with another 1/4 inch luan subfloor. We then installed vinyl plank flooring,trim, new toilet, installed new toilet flange, new vanity, countertop and faucet.
Wednesday, July 15, 2020
Tuesday, July 14, 2020
Subscribe to:
Posts (Atom)











