Wednesday, November 30, 2016

Door Install

The existing home had a door at the bottom of the stairway. We built a wall at the top and installed a door at the top of the steps. We removed the door at the bottom.


Monday, October 31, 2016

Bathroom Wall Tile Project



Sunday, October 30, 2016

Cown Molding Installation

Installed 5 1/4 inch crown molding and medallion in dining room, foyer, hallway and kitchen.




Saturday, October 29, 2016

Friday, October 28, 2016

Floor Install

Kitchen floor installation. Ceramic wood look 8 x 24 inch tiles used.





Sunday, October 9, 2016

Den Remodel

We converted the front den to a bedroom by adding a wall and door. We then built a closet with side shelving and french doors.




Friday, September 23, 2016

Interior paint

The home was previously dark colors. We primed and painted the entire home walls, ceilings and trim an off white.













Thursday, September 22, 2016

Column Install

The home had old round columns that we covered in a square design for a more modern look.