Monday, September 29, 2014

Hardwood floor and trim install

hand scraped maple hardwood floor and trim install



Thursday, September 11, 2014

kitchen remodel and home interior paint

Kitchen remodel and home paint job. New cabinets, new granite counters, sink and faucet, new vertical glass and stone back splash with kitchen, hallways and great room paint job.








Wednesday, September 3, 2014

Roof job completed

roof tear off and shingles. Ice guard, 30 lb felt, pipe collars, drip edge, vents and new dimensional shingles installed.


Friday, August 29, 2014

Master bath remodel

Bathroom tear out and new shower installation and new tile flooring.


Monday, August 25, 2014

Bathroom Remodel

Bathroom remodel with new tub install, plumbing and tile.

Bedroom makeover

Master bedroom makeover with master walk-in closet build. We used corrugated roofing for one wall, added gray paint and black trim with a charcoal color on the closet separating wall with stucco texture. The original closet was bi-folding doors on one wall (you can see the floor seam where the old closet ended). We then built a wall 1 foot short of the ceiling and added a custom cabinet system to both sides of the walk-in closet. We installed led lights on the top backside of the separating wall and mounted a led tv and fireplace.







Monday, August 11, 2014

Concrete Sidewalk and Step

Concrete sidewalk with a limestone step and brick risers to match the existing porch.

Stamped Concrete and Brickwork

Circle driveway and sidewalk cement work, two tone stamped concrete patio and stamped concrete walkway and porch. We also built the top level porch with a brick base as well as the brick piers, walls and limestone caps.