Friday, August 8, 2014

Exterior Home Remodel

We installed a new roof, vinyl siding and trim, post light, new porch build including pier build with stone split face limestone steps and composite tapered posts.



Thursday, August 7, 2014

Complete kitchen Remodel

Complete kitchen remodel. Installed cabinets, counter, sink, new appliances, hand scraped bamboo flooring, lighting, stone slate backsplash, kitchen island and burgandy venetian plaster on the walls as well as a custom handscraped window trim.



Sunday, July 27, 2014

Bathroom remodel

Complete bathroom tearout, plumbing rework, tile, window, cabinet, counter and sink, tub, diverter and lighting installation along with me subfloor and drywall.

Tuesday, July 22, 2014

Brick Driveway Arch repair

Original arch was falling and brick twisting and falling out on right side. We had to build a form to support the arch while removing it. Once the brick were removed we built the other side of arch support and rebuilt the arch and bricked on top.





Half bath Remodel and Shower Addition

Complete half bath tear out. Plumbing moved. Shower installed where toilet was, toilet moved to center of room and diverter plumbing and valves added. shower and pan installed with tile, floor and baseboards tiled, pocket door installed, new vanity and sink installed.






Brick wall patch

Flower box removed and bricks reused to fill in garage wall behind box.

Friday, July 11, 2014

Addition Footing Poured

The addition footing is poured, now to move the ac, furnace venting,sump pump and stripping brick from garage and house sides before foundation and brick of the addition.

Porch Finally Done

Old railings and steps installed to complete porch build.