Monday, June 30, 2014

Master Bath and Second floor Bath .

Tile cut out and installation of decorative glass tiles



Kitchen and Dining Room Floor Tile

Kitchen and dining room tile job using 12x24 tiles






Fireplace stone tile reface

Standard brick fireplace refaced with stone tiles.


Friday, June 27, 2014

Home Addition Footings

Addition footings being dug and ready for footing pour.


Porch and Limstone steps

Dearborn porch and cap build with limestone step construction with separate dry stacked risers and treads.


Porch Build Progress

Porch rebuild. Footing poured and block done. Cap and sidewalk still need to be installed.

Chimney Build

Chimney tear down and rebuild with decorative top.

Wednesday, June 18, 2014

Garage Build and Epoxy Floor

Garage build and floor epoxy done with Sherwin-williams tile clad