Thursday, November 22, 2012

DECK, PAVERS, FLOWER BOX INSTALL

We removed old cement steps and sidewalk, installed new front deck and steps. The porch install was a little difficult as it had to go over a weird cement bump out under the bay window. We installed a paver sidewalk and finally a cedar flower box.

Wednesday, November 21, 2012

CHIMNEY REBUILD

Rebuilt top half of chimney and tuckpointing.

Tuesday, November 20, 2012

CHIMNEY TUCK POINT AND WASH

A customer had the chimney repaired previously and this is how they left it. We removed all the joints, retucked it and applied a wash on the top.

BEFORE
AFTER

Saturday, November 10, 2012

STAIRWAY, FLOOR AND BANISTERS

Custom made staircase, hardwood floor and banisters. Some of the pics came out blurry.

Thursday, October 25, 2012

HOME REMODEL

Condo remod. Kitchen, bath laundry room remod, floors and paint throughout.