Friday, June 3, 2022

Deck Completion

Pool installed and drop down deck to pool added on with gate.




 

Thursday, June 2, 2022

Flooring Install

Old tile flooring and toilets removed. New vinyl plank flooring installed, shoe molding and new toilets.

Saturday, May 7, 2022

Partial Bathroom Remodel

Partial bathroom remodel. Tile removed from walls and floor. New tile, vanity, toilet, baseboards and walls repaired.


 

Friday, May 6, 2022

Thursday, May 5, 2022

Deck Build

20x16 deck build phase 1. pool will be installed next and a deck extension will attach to pool.



 

Wednesday, March 16, 2022

Log Home Pole Barn Apartment Bath Remodel

Part of our log home rehab project. Moving on to the barn apartment. Tore out flooring, vanity, toilet, ceiling and plumbing. We installed new flooring, redid the plumbing , installed new vanity and counter, new toilet, metal ceiling and fresh coat of paint and accessories. Its a shame what the previous owners of this home did with improper installations and neglect.






 

Sunday, March 6, 2022

Bathroom Remodel

Bathroom remodel. Fully gutted to the studs. Shower installed with new tile, plumbing, lights and switches, toilet. Just waiting for shower door, countertop, paint and mirrors.






 

Saturday, March 5, 2022

Log Home Basement Half Bath Remod

 New drywall, paint, flooring and replaced pedestal sink with a

smaller more appropriate sink.