2x6 treated deck build with steps and hand rail
Friday, August 28, 2020
Thursday, August 6, 2020
Tuesday, August 4, 2020
Monday, August 3, 2020
Sunday, August 2, 2020
Saturday, August 1, 2020
Fireplace Build
Fireplace framed out and board hung. Drywall installed on sides, Mantle installed, We then installed a stone face and tile trim around the opening and light electrical boxes.
Friday, July 31, 2020
Thursday, July 16, 2020
Bathroom Remodel
Small bathroom repair and remodel. The old toilet and vanity were removed. The flooring was removed as well as 3 layers of water damaged subfloor. We installed a new subfloor with another 1/4 inch luan subfloor. We then installed vinyl plank flooring,trim, new toilet, installed new toilet flange, new vanity, countertop and faucet.
Subscribe to:
Posts (Atom)












