Monday, December 9, 2019

Stone and granite BBQ Grill

Footing poured built out of block. Cultured stone added and a granite countertop. Grill and doors then installed


Saturday, December 7, 2019

Kitchen Backsplash





Wednesday, December 4, 2019

Bathroom and Shower Remodel

Bathroom was taken down to studs. Tile flooring installed, new shower pan, shower tile, light, plumbing fixtures, new vanity,toilet and paint.



Tuesday, November 12, 2019

Bathroom Remodel

Bathroom was gutted. New plumbing, tub, tub surround, drywall, tile, vanity, countertop and faucet, light and paint.





Thursday, November 7, 2019

Thursday, October 24, 2019

Door Sill Relocation

Interior step down raised to level with the rest of floor.New door installed. Door sill slab removed new coarse of bricks installed and sill reinstalled under door.



Friday, October 11, 2019

Flooring and Laundry Room

Old flooring removed and vinyl click lock flooring installed. Baseboards and trim installed and laundry room cabinet and appliance installation.