Sunday, February 5, 2017

Subway Tile Backsplash

White subway tile laundry room backsplash installed.


Friday, February 3, 2017

Master Bathroom Remodel

Complete bathroom demo. Water damage repaired. New cement board installed with red guard. New plumbing and light fixtures. Larger tub installed. Tile and thresholds installed.







Thursday, February 2, 2017

Fireplace Remodel

Wood mantle and surround with stone border and limestone hearth.

Wednesday, January 25, 2017

Bathroom remodel

Bathroom remodel with whirpool tub, stand up shower and door. Tiled ceiling and walls, installed cabinets and countertop, light fixtures and toilet.



Tuesday, January 24, 2017

Custom Fence Install

We installed a custom privacy fence, with dark stain and corrugated steel instead of wood on the panels with a lattice top.

Monday, January 23, 2017

Butcherblock Countertop

We installed a 1 1/2 inch thick oak butcherblock countertop in our previous laundry room build. We also installed an oak top and trim on the entry way halfwall.



Saturday, January 21, 2017

Custom Shelving

We built custom shelving and cabinets to go on either side of the tub in our earlier bathroom remodel. We built 3 shelves on each side and took apart and used a bifold door set for the doors.




Friday, January 20, 2017

Bathroom Remodel

Bathroom remodel. Floor, shower surround and tub install, vanity cabinet installation and toilet install.