White subway tile laundry room backsplash installed.
Sunday, February 5, 2017
Friday, February 3, 2017
Master Bathroom Remodel
Complete bathroom demo. Water damage repaired. New cement board installed with red guard. New plumbing and light fixtures. Larger tub installed. Tile and thresholds installed.
Thursday, February 2, 2017
Wednesday, January 25, 2017
Bathroom remodel
Bathroom remodel with whirpool tub, stand up shower and door. Tiled ceiling and walls, installed cabinets and countertop, light fixtures and toilet.
Tuesday, January 24, 2017
Custom Fence Install
We installed a custom privacy fence, with dark stain and corrugated steel instead of wood on the panels with a lattice top.
Monday, January 23, 2017
Butcherblock Countertop
We installed a 1 1/2 inch thick oak butcherblock countertop in our previous laundry room build. We also installed an oak top and trim on the entry way halfwall.
Saturday, January 21, 2017
Custom Shelving
We built custom shelving and cabinets to go on either side of the tub in our earlier bathroom remodel. We built 3 shelves on each side and took apart and used a bifold door set for the doors.
Friday, January 20, 2017
Bathroom Remodel
Bathroom remodel. Floor, shower surround and tub install, vanity cabinet installation and toilet install.
Subscribe to:
Posts (Atom)


















