Saturday, October 29, 2016

Kitchen Remodel

back splash installed in kitchen remodel.


Friday, October 28, 2016

Floor Install

Kitchen floor installation. Ceramic wood look 8 x 24 inch tiles used.





Sunday, October 9, 2016

Den Remodel

We converted the front den to a bedroom by adding a wall and door. We then built a closet with side shelving and french doors.




Friday, September 23, 2016

Interior paint

The home was previously dark colors. We primed and painted the entire home walls, ceilings and trim an off white.













Thursday, September 22, 2016

Column Install

The home had old round columns that we covered in a square design for a more modern look.


Wednesday, September 21, 2016

Stair railing and handrail

The old round honey oak rail and white spindles were removed and a new more modern oak square post and top rail were installed. We installed iron spindles and stained it expresso. We also installed a matching oak square handrail. We stained the half wall caps and trim to match.




Monday, August 8, 2016

Deck Build

25x21 deck build with aluminum spindles. Solar light post caps were also used.





Saturday, August 6, 2016

Shed Build

footing and slab poured. Shed Built and shingled.