slate look ceramic tile floor installation.
Tuesday, April 19, 2016
Friday, April 15, 2016
Garage Paint
Garage was power washed and scraped. Caulk was applied with 2 coats of primer and 2 coats of exterior paint.
Wednesday, March 23, 2016
Porch Reface
We removed the step and brick facing from the porch and installed new brick and reinstalled the step.
Tuesday, March 22, 2016
Monday, March 21, 2016
Chimney Rebuild
We tore down and rebuilt the top 10 coarses of the chimney. We also installed a new flue and a concrete cap.
Commercial Block Project and demo
We extended the front of the building up 12 coarses of block to match the existing building. We also demoed out all the roof trusses and roofing material.
Thursday, March 10, 2016
Handcap Bathroom Remodel
Complete bathroom remodel. Tub, tile and floor removed. New diverter installed, new drain and plumbing, shower pan installed, shower surround has been red gaureded, new tile installed, toilet, sink and vanity installed. Handicap grab bars will be installed later.
Wednesday, March 9, 2016
Complete Bathroom Remodel
Complete bathroom remodel. We tore bathroom down to studs and installed new tiled shower, walls,floor and custom mirror frame. We installed drywall, new plumbing, electrical, vanity, faucet, sink and toilet. We finished with paint and some decorative shelves.