Garage build with cultured stone pier facing to match installation of stone on the house.
Monday, December 21, 2015
Sunday, December 20, 2015
Friday, December 18, 2015
Thursday, December 17, 2015
Master Bath Remodel
Complete tearout down to studs. We installed new cabinets, countertops, sink and fixtures. We also installed new lighting, outlets and drywall. We tiled the floor, shower and tub surround and installed a new toilet and whirlpool tub.
Monday, December 14, 2015
Powder Room Remodel
The old powder room was demoed. We installed a new subfloor, cement board, tile, a new vanity, counter and faucet, toilet and put on two coats of paint.
Tuesday, December 8, 2015
Bar Backsplash
We finished the stone installation for the wet bar backsplash. The wet bar features new cabinets, countertops, a stainless trough sink and recycled pallet wood facing.
Monday, December 7, 2015
Garage Addition Project
Progress of our funeral home garage addition. We now have the concrete pad poured. Framing and sheathing also installed.
Thursday, November 26, 2015
Hardwood Floor Refinish
Living room and hallway floor refinish. The carpet and padding were removed and disposed of. The tack strips and staples were removed. All the holes were filled. The floor was then sanded and three coats of poly were applied for a natural finish.
Subscribe to:
Posts (Atom)



















