Commercial block building primed with luxon primer and Sherwin williams superpaint.
Sunday, May 10, 2015
Thursday, May 7, 2015
Brick Porch and Sidewalk
Porch top, step and sidewalk build with clay brick pavers. The porch and step were built with red common brick to match the existing home. A cement porch cap was poured with wire. We then used a cement/mortar mix to set the brick and grout the joints.
Monday, May 4, 2015
Garage build
Step 1 for garage build. 42" footings dug, foundation poured, 2 coarses block under grade 2 above grade, anchor bolts installed, openings for front and rear garage doors and a 36" Side door.
Tuesday, April 28, 2015
Brick Paver Sidewalk and Steps
Brick paver sidewalk with brick and paver steps. The old cement walk was removed. A 42" footing was dug for the steps. cement was laid with wire to lay the brick. The brick pavers were cemented down and joints filled. We then built two brick steps to match the homes existing brick and capped them with brick paver stair treads.
Thursday, April 9, 2015
Basement Wall Repair
Dirt was excavated from rear of home, the rear wall was supported, damaged and bowing block basement wall removed. The wall was reblocked, drain tile, glass block window installed and ground backfilled.
Plow Truck Through Wall Repair
A plow truck hit the side of building damaging brick corner and pushing through interior wall, breaking studs and drywall.
Outside was rebricked. The inside had studs, drywall and insulation removed. New studs, insulation and dywall were installed, along with electrical and phone lines reran and paint.
Friday, March 13, 2015
Full Basement Remodel
Full basement remodel. Walls and ceilings installed. Partitions built for main basement area,bathroom, main bar area, office, side bar area and workout room. Paint,trim, windows, concrete countertops, carpet, cabinets, sinks, lighting, electrical, plumbing, wine rack, tile crownmolding and hidden mood lighting installed.