Brick paver sidewalk with brick and paver steps. The old cement walk was removed. A 42" footing was dug for the steps. cement was laid with wire to lay the brick. The brick pavers were cemented down and joints filled. We then built two brick steps to match the homes existing brick and capped them with brick paver stair treads.
Tuesday, April 28, 2015
Thursday, April 9, 2015
Basement Wall Repair
Dirt was excavated from rear of home, the rear wall was supported, damaged and bowing block basement wall removed. The wall was reblocked, drain tile, glass block window installed and ground backfilled.
Plow Truck Through Wall Repair
A plow truck hit the side of building damaging brick corner and pushing through interior wall, breaking studs and drywall.
Outside was rebricked. The inside had studs, drywall and insulation removed. New studs, insulation and dywall were installed, along with electrical and phone lines reran and paint.
Friday, March 13, 2015
Full Basement Remodel
Full basement remodel. Walls and ceilings installed. Partitions built for main basement area,bathroom, main bar area, office, side bar area and workout room. Paint,trim, windows, concrete countertops, carpet, cabinets, sinks, lighting, electrical, plumbing, wine rack, tile crownmolding and hidden mood lighting installed.
Monday, February 16, 2015
Sunday, January 4, 2015
Laminate floor install
Old floor demo. We then installed laminate flooring and trim in the kitchen. Toilet was removed and reinstalled to install laminate and trim in bathroom.
Saturday, December 27, 2014
Bathroom Remodel
This is a complete bathroom remodel.
Entire demolition, new tub, tile shower surround with shelves and accents, new tile floor, new drywall, new cabinets and toilet install, glass tile backsplash, new plumbing fixtures, bath fan install.