Monday, February 16, 2015

Laminate Floor installation

Cherry laminate Floor installation.



Sunday, January 4, 2015

Laminate floor install

Old floor demo. We then installed laminate flooring and trim in the kitchen. Toilet was removed and reinstalled to install laminate and trim in bathroom.




Saturday, December 27, 2014

Bathroom Remodel

This is a complete bathroom remodel. Entire demolition, new tub, tile shower surround with shelves and accents, new tile floor, new drywall, new cabinets and toilet install, glass tile backsplash, new plumbing fixtures, bath fan install.




Monday, December 8, 2014

Bathroom tile

Bathroom tile installation and jacuzzi tub tile and install.


Friday, November 14, 2014

Wednesday, November 12, 2014

Kitchen cabinet, granite counter and backsplash install

New kitchen cabinet installation along with granite counter top and backsplash installation.


Bathroom renovation

Complete bathroom tearout. We then installed new cement board installed floor, wall and shower tile. We also installed jacuzzi tub, electrical ,plumbing, new toilet and vanity.







Exterior siding installation and paint

Installation of cedar shake siding, hardiboard siding, trim installation. The cedar shake was then stained, hardiboard painted and trim painted.