Repair on stone that was broken when old porch was tore out. Looks like whoever did the porch also pulled up the footing on the front wall.
Saturday, July 5, 2014
Commercial block work
Removal of bay door and blocked closed with 12 inch block. Cutting out 10 windows and a doorway in the block also. The 2 sides of the blockup have been left open to cut out windows.
Monday, June 30, 2014
Friday, June 27, 2014
Porch and Limstone steps
Dearborn porch and cap build with limestone step construction with separate dry stacked risers and treads.
Subscribe to:
Posts (Atom)


















