Saturday, July 5, 2014

Stone Flower box stone repair

Repair on stone that was broken when old porch was tore out. Looks like whoever did the porch also pulled up the footing on the front wall.

Commercial block work

Removal of bay door and blocked closed with 12 inch block. Cutting out 10 windows and a doorway in the block also. The 2 sides of the blockup have been left open to cut out windows.

Monday, June 30, 2014

Master Bath and Second floor Bath .

Tile cut out and installation of decorative glass tiles



Kitchen and Dining Room Floor Tile

Kitchen and dining room tile job using 12x24 tiles






Fireplace stone tile reface

Standard brick fireplace refaced with stone tiles.


Friday, June 27, 2014

Home Addition Footings

Addition footings being dug and ready for footing pour.


Porch and Limstone steps

Dearborn porch and cap build with limestone step construction with separate dry stacked risers and treads.


Porch Build Progress

Porch rebuild. Footing poured and block done. Cap and sidewalk still need to be installed.