Complete bath tearout down to the studs. There was no existing bathtub just a shower with center drain. Insulation added to walls, cast iron tub installed along with new drain and plumbing. Tile also installed.
Tuesday, March 18, 2014
Thursday, February 6, 2014
Tuesday, January 28, 2014
Finished basement remodel nearing completion
Almost finished. Only carpet, frameless glass shower door, cleaning, theatre seating on platform and touch up paint to go.
Wednesday, January 22, 2014
House Flip
House flip. Entire home paint, new kitchen tile floor, custom cement countertops, cabinets refinished
Thursday, December 19, 2013
Basement Steamroom
Steamroom build and tile. Travertine tile with volcanic rock shower floor and cubby shelf. Granite thresh holds and bench tops will be installed at a later date.
Wednesday, December 4, 2013
Great Room and Kitchen Remodel
This kitchen and great room remodel includes fireplace install and stone, dark handscraped hardwood floors, new cabinets, granite counters, tiled backsplash, stainless steel appliances, new sink, fixtures, lighting and paint. We also removed a wall that separated the space and put in an island.
Tuesday, December 3, 2013
Fireplace installation and stone.
This is the fireplace that was installed and stoned which was part of our great room and kitchen remodel.
Monday, December 2, 2013
Bathroom remodel Completed
Complete bathroom remodel. Tearout down to the studs. New shower installed, drywall paint, cabinets, sinks, lighting and floor installed.
Subscribe to:
Posts (Atom)



















































