Monday, July 22, 2013

Kitchen remodel






Saturday, July 6, 2013

Deck Build Completed



Friday, July 5, 2013

Bathroom and Steam Shower tile

Tile floor, walls and steam shower for bathroom remodel. Heated flooring also installed. The shower seat and curb top will be granite to match the vanity counter top. The front of the shower will feature floor to ceiling glass doors and panels.





Wednesday, June 26, 2013

Basement walkout entry way floor tile

Walkout entry way tile install, 16x16 inch tiles were used.

Tuesday, June 25, 2013

Basement bathroom tile

Shower and bathroom tile for basement remodel project.




Sunday, June 16, 2013

Wood look tile

Wood look tile installation on basement remodel project.








Saturday, May 18, 2013

Wixom Deck Build

Deck completed. 2x6 decking with aluminum spindles.









Sunday, May 12, 2013

Exterior Painting Job

Wood replacement and Sherwin williams Duration exterior paint.