Tuesday, April 30, 2013

Kitchen Remodel

Kitchen remodel done. We installed hardwood floor in kitchen and attached dining area, installed new lighting, removed separating wall and converted into an island top and angled it, new cabinets, new plumbing, new counter, new paint and door. I'm probably forgetting something also.

Thursday, April 18, 2013

Chimney Rebuild

Chimney rebuild with bee nest removal, wash and cap.
The cap and wash were done this way to match other cap washes in the neighborhood.




Wednesday, April 17, 2013

Bamboo Hardwood floor Install

We had to level the existing subfloor to meet the new subfloor in hallway area. Installed 1/2" bamboo flooring and bamboo quarter round. Now its ready for cabinets and paint!













Tuesday, March 26, 2013

Tuesday, March 19, 2013

Reparing termite damage in a home

We completed the repair for termite damage. We had to cut out drywall and replace top plates on damaged walls. We jacked up the roof to support the weight while we removed and replaced the top plates. Once the drywall was replaced we primed and painted. Before and after Photos.

Thursday, March 7, 2013

Warren job done

Warren mi job completed. Ceilings and walls repaired. Ceilings and walls primed, ceilings were then painted. Wallpaper removed in 2 bedrooms, kitchen, nook and bathroom. Trim and doors painted white. Two bedrooms painted. Bathroom tile was sanded, primed and epoxied white. Materials were purchased for the rest of home.

Heritage assisted living drywall completed

drywall replacement done with tape mud sand and prime.