Tuesday, April 23, 2024

Composite deck resurface and rails

Old decking and rails removed. Joists added for 16 inch on center. New trex coastal bluff composite installed with hidden fasteners and trex bronze signature classic aluminum railings installed.




 

Monday, April 22, 2024

Fireplace Build

Fireplace framed out and stoned. Space for fireplace and swinging tv mount.


 

Saturday, April 20, 2024

Shower Door In


 

Friday, April 19, 2024

Limestone Step Install

We removed old 36 inch precast step and installed a 3 inch by 48 inch limestone stair tread with brick riser.