New 220 receptacle installed for stove, backsplash installed, shelving installed and bakers racks, refrigerator added, new sink faucet and plumbing installed, fresh paint.
Tuesday, January 4, 2022
Monday, January 3, 2022
Log Home Partial Bathroom Remodel
New bath fan installed, fresh paint, new bronze bathroom hardware, new faucet and shower fixtures. We also moved the light up and installed a new fixture and mirror, over the toilet cabinet installed. New dinosaur themed decor. Logs were cleaned with a vinegar mixture and then gone over with peroxide mixture. Logs then sealed with a clear coat log sealer.
Sunday, January 2, 2022
Log Home Master Bath Remodel
Old one peice fiberglass shower surround removed, flooring demoed, toilet and subfloor removed. New plumbing installed, water damage repaired, new tile shower installed with red gaurd waterproof membrane, new toilet, subfloor, lifeproof vinyl plank flooring installed, new metal roof ceiling and trim, new bath fan sink fixtures and custom medicine cabinet, new mirror and light, elwctrical outlets moved and light fixture moved. Fresh paint.
Subscribe to:
Posts (Atom)