Wednesday, December 22, 2021

Vinyl Plank Install





 

Tuesday, December 21, 2021

Bathroom Remodel

Monday, December 20, 2021

Flooring Install

vinyl plank flooring





 

Friday, December 3, 2021

Wednesday, November 10, 2021

Basement Office Remodel

Water damagged carpet removed,drywall,baseboards and wall framing. New wall framing installed, drywall repaired and painted. We installed vinyl plank flooring with new baseboards and a new light.




 

Sunday, October 17, 2021

Trex Deck Build

Old decking and railing removed. Damaged edger board removed and new post and beams installed to replace ledger. New tiki torch trex decking and bronze aluminum trex railing installed.








 

Saturday, October 16, 2021

Chimney Rebuild

Chimney was taken down to the roof. New flues were installed and chimney rebuilt. Flashing added and previously damaged shingles were replaced.



 

Wednesday, September 29, 2021

Bathroom Remodel

Complete bathroom remodel down to studs. New plumbing for double sink installed and shower. New tub and vanity installed. New drywall in entire room. Shower and walls tiled with a blue subway tile, floors tiled with a 4x4 pattern tile and accent wall tiled with white penny tiles. New toilet , light fixtures and accessories installed.






 

Tuesday, September 28, 2021

Basement Finish


Ceiling drywall was removed , old paneling removed. Leak on wall was repaired. We painted the ceiling black and painted walls and closets. New carpet installed.





 

Sunday, September 26, 2021

Den Remodel

New window and door casings. New baseboards. We ship lapped the walls and painted a grey color. New carpet was also installed.



 

Saturday, September 25, 2021

Partial Bathroom remodel

Partial bathroom remodel. new vanity countertops and faucet, new toilet, mirrors, light fixture and accessories.



 

Thursday, September 2, 2021

Bathroom Remod Work

2 Vanity installs. One a 60 inch vanity the other a 48 inch with vinyl luxury plank floor installed.