Monday, May 25, 2020
Retaining Wall Edging
Flower bed landscape edging blocks installed 3 layers high.
Friday, May 22, 2020
Beadboard Ceiling
Bathroom remodel finished by installing a pvc beadboard ceiling with 6" pvc trim.
Thursday, May 21, 2020
Block Landscape edging
Base and three layers of edging block installed.
Tuesday, May 12, 2020
New Composite Steps
Old concrete steps removed and new composite decking stairs installed.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)