Friday, December 27, 2019

Floor Installation

Vinyl plank flooring installation.

Tuesday, December 24, 2019

Fireplace Trim Install

Fireplace trim installation on previous project.

Monday, December 23, 2019

Barn Door installation


Custom 4 ft by 8ft Birch barn door with 8ft bracket installed on previous wall project.


Wednesday, December 11, 2019

Outdoor Fireplace

Outdoor fireplace built out of block and stone, then doors added. Matching previous deck/pergola grill projects.


Tuesday, December 10, 2019

Laundry Room Bath Combo

Curbless shower and toilet installed laundry installed. Tile and fixtures were then installed.


Monday, December 9, 2019

Stone and granite BBQ Grill

Footing poured built out of block. Cultured stone added and a granite countertop. Grill and doors then installed


Wednesday, December 4, 2019

Bathroom and Shower Remodel

Bathroom was taken down to studs. Tile flooring installed, new shower pan, shower tile, light, plumbing fixtures, new vanity,toilet and paint.