Tuesday, June 25, 2019

Porch Build

Porch build with steps and black aluminum rail. Cultured stone still needed for sides of porch.



Thursday, June 13, 2019

Deck Build

Redo of 550 sf 4 level deck. With pvc lattice upgrade.






Monday, June 10, 2019

Deck Remodel

Old deck rails and boards were removed. The original deck was sloping back towards the home. We leveled the deck then replaced rotten fascia boards, steps, decking and rails with black aluminum spindles.


Sunday, June 9, 2019

Update on fireplace

Stonework and mantle completed after the limestone hearth slabs were installed. Final project after completion.




Tuesday, June 4, 2019

Rustic Bathroom Remod

Rustic bathroom with handmade vanity and marble sink. Faux wood floor tiles. Galvanized steel panel walls with stone shower floor and inserts. Lantern lighting.





Handrail Installation

Black aluminum handrail installation.

Brick Step Install

Old precast step was removed and new brick step installed to match the porch brick.