Vinyl plank flooring installation.
Friday, December 27, 2019
Tuesday, December 24, 2019
Monday, December 23, 2019
Saturday, December 21, 2019
Friday, December 13, 2019
Thursday, December 12, 2019
Wednesday, December 11, 2019
Outdoor Fireplace
Outdoor fireplace built out of block and stone, then doors added. Matching previous deck/pergola grill projects.
Tuesday, December 10, 2019
Monday, December 9, 2019
Stone and granite BBQ Grill
Footing poured built out of block. Cultured stone added and a granite countertop. Grill and doors then installed
Saturday, December 7, 2019
Wednesday, December 4, 2019
Bathroom and Shower Remodel
Bathroom was taken down to studs. Tile flooring installed, new shower pan, shower tile, light, plumbing fixtures, new vanity,toilet and paint.
Monday, November 25, 2019
Tuesday, November 12, 2019
Bathroom Remodel
Bathroom was gutted. New plumbing, tub, tub surround, drywall, tile, vanity, countertop and faucet, light and paint.
Thursday, November 7, 2019
Thursday, October 24, 2019
Door Sill Relocation
Interior step down raised to level with the rest of floor.New door installed. Door sill slab removed new coarse of bricks installed and sill reinstalled under door.
Friday, October 11, 2019
Flooring and Laundry Room
Old flooring removed and vinyl click lock flooring installed. Baseboards and trim installed and laundry room cabinet and appliance installation.