Old porch removed and new porch built with rock face block. Steps built with rock face brick and limestone treads. Handrail installed and new step footing and cement porch cap and walkway.
Monday, April 30, 2018
Sunday, April 29, 2018
Saturday, April 28, 2018
Friday, April 27, 2018
Fireplace surround
The old wood mantle and stone surround were removed. The drywall repaired and a simple aluminum tile surround was installed.
Thursday, April 19, 2018
Footing and Porch Foundation
42 inch footing and 2 coarse of block porch foundation. A cement cap and steps will be installed later.
Sunday, April 8, 2018
Tuesday, April 3, 2018
Custom Pantry Build and Closet Remodel
The existing pantry was 6 inches deep. We added a custom built 24 inch deep pantry to reuse the old existing door sizes. The pantry closet next to it had a bifold door which prevented half the access when open. We added a standard door and re-trimed the opening and installed a ball catch for closing.
Monday, April 2, 2018
Porch Rebuild ans Step Replacement
Porch repair and step replacement. We removed the old damaged block and replaced with new block, we themn rmoved a single concrete step and replaced with 2 steps with limestone treads.