Chimney tear down and rebuild with new cap and wash.
Saturday, March 31, 2018
Thursday, March 29, 2018
Tuesday, March 27, 2018
Chimney Rebuild
tear down and rebuild of chimney with common bricks. We installed a false flue limestone cap and wash.
Saturday, March 10, 2018
Small Basement Remodel
The ceiling was painted flat black and lights wired. We then installed vinyl plank wood flooring on the main basement room and stairway.
Friday, March 9, 2018
Bathroom Remodel
Old pink and black tile was removed. New cement board installed with red gaurd waterproofing. We then installed marble tile with a herringbone pattern on the walls and wood look tile on the floor. New shower fixtures, bath fan, tub, toilet, light, mirror, and accessories were installed.
Subscribe to:
Posts (Atom)