Small basement bathroom addition. The concrete was cut out and removed to run drain lines for the toilet, shower and venting. The cutout was then recemented. Tile and grout installed. We then added a light, switch and receptacle. Toilet, shower and sink were installed. We also installed shelving behind sink and to the right outside of the pictured area.